• 845-634-4694
  • 234 North Main Street
          New City, NY 10956
Talk to us about your project
Clients / 7-11
Skills Used / Engineering, Surveying, Planning

This project was a redevelopment of a 1950s gas station that featured a set of pumps out in front. The structure simply wasn’t efficient anymore, and as a result had sat dormant for about six or seven years. We did a total redesign of the site, bringing it up to code, making sure it met all drainage criteria, and offered state-approved access in and out of the site. We had to use design techniques to overcome issues with the substandard size and shape of the building.

drainage engineering firm rockland county ny

newspaper templates - theme rewards